This detail outlines the layout requirements for a new concrete equipment pad. The pad must be sized twelve inches larger than the equipment footprint on all sides. Conduit penetrations are to be field coordinated with the specific equipment being installed.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership