A 120-volt circuit backed by a generator and originating from data hall number five routes through four sequential emergency power off stations designated EPO-5-1 through EPO-5-4. Each station interrupts the circuit path to ensure rapid power shutoff in critical data center areas.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership