A four-conduit electrical ductbank assembly features conduits arranged in a square configuration with 7.5-inch center-to-center spacing horizontally and vertically. The top of the ductbank sits at a depth of 24 inches minimum to 36 inches maximum below finished grade per project notes. A continuous underground-line conducting warning tape is installed 12 inches below finished grade, centered above the ductbank assembly within the earth backfill.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe