Standard pipe blow off installations, pipe bends, tees, and valves feature associated concrete thrust blocking and reinforcing rebar. Thrust blocks are sized proportionally to pipe diameters, maintaining minimum clearances such as a two-inch minimum separation. Additional blocking is placed as directed in the field. Rebar is detailed around pipe bends to anchor the assembly against internal pressure.
ELEVATION TYPICAL BEND TEE OR VALVE SEE SCHEDULE ADDITIONAL BLOCKING AS DIRECTED 4 REBAR TYPICAL END OF LINE BLOW OFF INSTALLATION HORIZ. 4 DIA OF PIPE 4 DIA OF PIPE 2" DIA MIN