This temporary interceptor swale is cut into the existing ground with a minimum depth of one foot and a minimum bottom width of two feet. The side slopes are constructed at a minimum ratio of two-to-one. A check dam is installed within the swale to manage flow and erosion control.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership