Existing materials are stripped a minimum of twelve inches below existing grade to prepare the subgrade. A soil stabilization fabric lines the excavated trench and extends up the sloped sides. A minimum twelve-inch layer of quarry spalls is placed directly over the fabric.
12" MIN QUARRY SPALLS STRIP 12" MIN EXIST MATERIALS EXIST GRADE SOIL STABILIZATION FABRIC
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership