This civil section details the transition between existing bridge footings utilizing portland cement concrete slope paving at a one-to-one slope. A Type 5 retaining wall with a footing is positioned at the toe of the slope, with a retained height ranging from three feet to five feet. The right-of-way line and original ground line are indicated, maintaining a minimum six-inch clearance.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Sign in to subscribe