A concrete sidewalk ramp section features indicated slopes of 12:1 and 4 percent, resting on a prepared subgrade and concrete base. A three-quarter-inch vertical dimension clarifies the transition height at the curb or landing interface.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership