Entry control point pavement marking includes white paint with black text and a red line layout. Markings must match existing dimensions and require contracting officer approval prior to striping.
ENTRY CONTROL POINT NOTE: 1. ENTRY CONTROL POINT MARKING SHALL MATCH THE EXISTING DIMENSIONS AND BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO STRIPING. RED LINE WHITE PAINT, BLACK TEXT LOCATION ON PLANS RED LINE CS504 F14 CS504 M21
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership