A scheduled rubber transition strip bridges the transition between scheduled resilient floor or vinyl composition tile and scheduled carpet, aligning with the door and frame where it occurs. The assembly accommodates a one-quarter-inch height difference between the adjacent flooring finishes over the subfloor.
SCHEDULED RESILIENT FLOOR / VCT SCHEDULED RUBBER TRANSITION STRIP (MATCH SCHEDULED CARPET FINISH) SCHEDULED CARPET (CPT) DOOR & FRAME WHERE OCCURS 1/4".
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership