The partition wall as scheduled terminates at the concrete floor slab with a J-runner track at the base and top. Insulation fills the wall cavity, while shaft liner with SMD is installed on the shaft side. Firestopping sealant is applied typically at the slab edge joints, complemented by edge fire caulking.
INSULATION, W.O. PARTITION AS SCHEDULED EDGE FIRE CAULKING, TYP J-RUNNER FIRE STOPPING SEALANT, TYP. SHAFT SIDE SHAFT LINER W.O., SMD
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership