A transition between scheduled wall finishes utilizes a 1 1/4" x 1 1/4" x 1/8" stainless steel angle with square edge secured over a three-quarter-inch fire-treated plywood backing panel. A joint sealant is applied at the angle junction, adjacent to a thinset mortar bed supporting the upper wall finish. At the base, a scheduled wall base meets a scheduled floor finish with a one-quarter-inch aluminum divider strip provided at terrazzo floor finishes.
SCHEDULED WALL FINISH SCHEDULED PARTITION SCHEDULED WALL BASE SCHEDULED FLOOR FINISH THINSET MORTAR BED 1/4" 1/4" 1/2" 1/4" 1 1/4" x 1 1/4" x 1/8" STAINLESS STEEL ANGLE WITH SQUARE EDGE JOINT SEALANT 1/4" ALUMINUM DIVIDER STRIP 3/4" FIRE TREATED PLYWOOD BACKING PANEL 3/8" (AT TERRAZZO FLOOR FINISH) 1/2" SCHEDULED WALL FINISH SCHEDULED PARTITION SCHEDULED WALL BASE SCHEDULED FLOOR FINISH THINSET MORTAR BED 1/4" 1/4" 1/2" 1/4" 1 1/4" x 1 1/4" x 1/8" STAINLESS STEEL ANGLE WITH SQUARE EDGE JOINT SEALANT 1/4" ALUMINUM DIVIDER STRIP 3/4" FIRE TREATED PLYWOOD BACKING PANEL 3/8" (AT TERRAZZO FLOOR FINISH) 1/2" 3
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership