A scheduled hollow metal door frame connects to the underside of a scheduled metal stud partition. Half-inch insulation infill is placed within the metal framing where required. A scheduled door seal is installed at the door head where required above the scheduled door. The door jamb extends beyond the head assembly as scheduled.
1/2" INSUL INFILL AT METAL FRAMING WHERE REQ'D DOOR JAMB BEYOND SCHEDULED DOOR SCHEDULED HM DOOR FRAME SCHEDULED DOOR SEAL WHERE REQ'D SCHEDULED PARTITION
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership