Backfill is removed as required to access the existing concrete wall at the garage below grade. Existing lagging is removed where it occurs during demolition. The existing 500 University garage wall remains in place along with its existing waterproofing membrane. The membrane is patched and repaired as required due to any demolition damage.
REMOVE (E) LAGGING WHERE OCCURS DEMOLITION REMOVE BACKFILL AS REQUIRED TO ACCESS (E) WALL 500 UNIVERSITY GARAGE WALL, (E) TO REMAIN (E) WATERPROOFING MEMBRANE TO REMAIN. PATCH AND REPAIR AS REQUIRED DUE TO DEMO DAMAGE. THOITS BROS., INC
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership