The safety flooring assembly is secured to an approved substrate over an epoxy adhesive with a routed cove at the floor-to-wall intersection. The top of the integral base terminates with a vertical trim piece and sealant, installed prior to the partition wall finish.
NOTE: ECO-GRIP MUST BE INSTALLED PRIOR TO WALL COVER INSTALLATION. RF-4 SLIP RESISTANT SAFETY FLOORING AND INTEGRAL BASE ECO-GRIP EPOXY ADHESIVE ROUTED COVE APPROVED SUBSTRATE 4.5" @ SKI SCHOOL 6" @ KITCHEN ECO-GRIP SEALANT TD-22 VERTICAL TRIM AT SAFETY FLOORING BASE, VERIFY PROFILE SIZE PER APPLICATION PARTITION AND WALL FINISH PER SCHEDULE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership