The louver assembly is anchored to the cast-in-place concrete stem wall using clip angles at the top and bottom. A three-quarter-inch joint between the top of the louver and the concrete structure is sealed with backer rod and sealant.
CLIP ANGLE AT TOP AND BOTTOM LOUVER ASSEMBLY, SEE ELEVATION CAST-IN-PLACE CONCRETE STEM WALL EDGE OF CONCRETE SLAB SEALANT AND BACKER ROD SEE ELEVATION EXTERIOR INTERIOR 3/4"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership