Casework as specified in the project schedule is supported by a base box and necessary blocking. The base box is set back three inches from the face of the casework to create the toe kick. The base finish is applied as scheduled, covering the front of the base box assembly.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe