A hollow metal frame is set against a concrete opening with a two-inch vertical alignment clearance. Joint sealant and backing rod are installed in the gap between the concrete and the frame head. A door as scheduled hangs within the frame assembly.
ALIGN JOINT SEALANT AND BACKING 2 " HOLLOW METAL FRAME DOOR AS SCHEDULED CONCRETE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership