An existing concrete slab supports polished concrete on one side and scheduled epoxy flooring on the other. A mill-finished aluminum Pemko 196 floor plate and safety tread sits at the junction between the two floor finishes. The centerline of the transition aligns with the centerline of the door or opening above.
POLISHED CONCRETE EPOXY FLOORING, AS SCHEDULED CENTERLINE OF TRANSITION TO ALIGN WITH CENTERLINE OF DOOR OR OPEINING, WHERE OCCURS. DOOR, WHERE OCCURS C L EXISTING CONCRETE SLAB PEMKO 196 FLOOR PLANTE / SAFETY TREAD, FINISH 196A, MILL FINISHED ALUMINUM
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership