The assembly details a prefinished aluminum window wall jamb meeting glass fiber reinforced concrete panels on a steel framework. R-19 non-faced batt insulation fills the framing cavity. A backer rod and sealant joint provides weather-sealing between the window frame and the panel return. Future five-eighths inch gypsum board is scheduled as not in contract.
3/4" 21/2" 2" GFRC PANELS ON STEEL FRAMEWORK W/ R 19 NON-FACED BATT INSULATION PREFIN. ALUM. WINDOW WALL- SEE EXTERIOR ELEVATIONS FOR GLAZING TYPES BACKER ROD AND SEALANT FUTURE 5_ 8 " GYP. BD. N.I.C.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership