A scheduled door and frame assembly rests on a metal angle threshold transition, dividing a carpeted interior floor from a metal grate floor deck. The metal grate floor deck is supported on a mortar setting bed over a concrete floor slab. A carpet transition strip bridges the finish change at the door frame base.
CARPET METAL GRATE FLOOR DECK SETTING BED CONCRETE FLOOR CARPET TRANSITION STRIP SCHEDULED DOOR AND FRAME C
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership