A concrete ramp construction features a concrete floor slab and ramp assembly with a damp-proofing membrane on Z-clips applied to the vertical concrete surface. A 1 3/4-inch by 1/2-inch steel handrail and matching vertical support mount adjacent to the wall. A 3/16-inch steel cane rail and a sloped steel angle are embedded or attached near the base. A 1-inch reveal is detailed at the base of the wall with specified paint finishes.
V A R I E S 4 " 2 ' - 9 " 4 " 2 " 2 " CL 1 3/4" X 1/2" STEEL HANDRAIL, HND RL-1 1 3/4" X 1/2" STEEL HANDRAIL VERTICAL, HND RL-1 DMP-4 ON Z-CLIPS 1 " PNT-8 @ REVEAL UP TO 3" A.F.F. 3/16" STEEL CANE RAIL, PNT-11 MTL-3 CONC-2 RAMP 1 1 / 2 " SLOPED STEEL ANGLE, PNT-11 CONC-2 4 "
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership