Cold-formed steel ceiling joists bear on continuous top tracks of metal stud walls, secured with number eight screws at each joist. Three and five-eighths inch by eighteen gauge ceiling ties are fastened with one number eight screw at each joist. Wall framing consists of metal studs per schedule tied to continuous tracks with two number eight screws at each stud. Wall finishes are specified on the floor plan and finish schedule.
2 AD.6 2 AD.6 1 AD.6 1 AD.6 SEE SCHED. CEILING JOIST #8 SCREWS @ 8" O.C 2-#8 SCREWS @ EACH JOIST A 3 5/8" x 18 GA. CEILING TIES (SEE SCHEDULE) WITH 1-#8 SCREWS @ EACH JOIST FOR CEILING JOIST SEE SCHEDULE FOR FINISH SEE FLOOR PLAN & FINISH SCHEDULE CONT. TRACK 2-#8 SCREWS @ EACH STUD TO TOP TRACK METAL STUD SEE SCHED. CONT. TRACK 2-#8 SCREWS @ EACH BLK'G 2-#8 SCREWS @ EACH STUD TO TOP TRACK FOR FINISH SEE FLOOR PLAN & FINISH SCHEDULE METAL STUD SEE SCHED. 3
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership