The interior partition and wall finish are installed per schedule, supporting a lower wallcovering wainscot secured with low volatile organic compound adhesive per the manufacturer recommendations. A TD-20 trim piece transitions the wallcovering edge to the upper painted wall finish. Tape and joint compound finish the gypsum board joints as indicated, with the total wainscot height matching elevations.
PARTITION AND WALL FINISH PER SCHEDULE TD-20 TRIM AT WALLCOVERING EDGE WC-2 WALLCOVERING WAINSCOT, LOW VOC ADHESIVE PER MANUFACTURER. SEE ELEVATION FOR EXTENTS TAPE AND JOINT COMPOUND HT PER ELEVATION PAINT FINISH PER SCHEDULE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership