The top of a cold-formed steel stud wall frames up to a concrete mezzanine slab supported by metal decking and open-web steel joists. The double two-by metal stud track interfaces with a half-inch maximum gap beneath the underside of the deck. A UL-listed firestop is installed within this gap alongside mineral wool insulation to maintain the required fire-resistance rating. Gypsum board finishes the stud wall on both sides, terminating below the slab intersection.
1/2" GAP MAX SECT A-A CONCRETE MEZZANINE SLAB METAL DECKING OPEN-WEB JOIST 2X METAL STUD TRACK STUD WALL GYP BOARD CONCRETE MEZZANINE SLAB METAL DECKING 2X METAL STUD TRACK STUD WALL GYP BOARD 2X METAL STUD MINERAL WOOL INSULATION U.L. LISTED FIRE STOP IN 1/2" GAP A & STUDS B.O. DECK T.O. GYP U.L. LISTED FIRE STOP IN 1/2" GAP 2X METAL STUD