A concrete dock apron connects to a vertical concrete wall with a half-inch expansion felt joint placed between the members. Traffic caulking seals the joint at the top surface, while a series of two-inch diameter weep holes spaced at six feet on center with a protective screen at the back provide drainage.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership