An elevator shaft wall assembly meets a suspended concrete deck with a structural beam supporting the floor level at one hundred feet zero inches. Fire sealant is applied at the floor slab junction above the shaft. An interior wall assembly and fire-rated wall assembly continue above the floor line, coordinated per floor plans. A scheduled ceiling is suspended below the floor deck, coordinated per reflected ceiling plans.
INTERIOR WALL ASSEMBLY RE: FLOOR PLANS LEVEL 1 100'-0" STRUCTURAL BEAM, RE: STRUCTURAL DRAWINGS SUSPENDED CONCRETE DECK, RE: STRUCTURAL DRAWINGS SCHEDULED CEILING RE: REFLECTED CEILING PLANS FIRE SEALANT FIRE-RATED WALL ASSEMBLY RE: FLOOR PLANS INTERIOR WALL ASSEMBLY RE: FLOOR PLANS SHAFT
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership