An aluminum door frame integrates with boxed metal stud framing and standard metal stud framing at a door jamb. Batt insulation fills the wall cavity behind gypsum board layers, with an additional gypsum board layer installed where required. The door panel is sized per the door schedule and meets the aluminum frame rabbet. The jamb assembly accommodates openings ranging from 3'-0" to 8'-0".
METAL STUD FRAMING BATT INSULATION ADDITIONAL GYP BD LAYER WHERE OCCURS BOXED METAL STUD FRAMING GYP BOARD ALUM DOOR FRAME DOOR SEE DOOR SCHEDULE NOTE: FOR OPENINGS 3'-0" TO 8'-0" 1 1/2"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership