Soil and aggregate material stockpiles consist of existing site material for reuse or new material to be installed in the work. A double row of silt fencing surrounds the perimeter and designated directions of runoff flow are indicated. Stockpile heights must not exceed thirty-five feet, and slopes must be maintained at two-to-one or flatter. All existing excavated material not designated for reuse must be immediately removed from the site and properly disposed of, and stockpile sites must be restored and reseeded upon completion.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership