Continuous sealant is installed along the perimeter of the mechanical louver assembly located near grid lines eleven through thirteen. The cold-formed metal subcontractor is responsible for engineering the support angles, and anchors necessary to secure the mechanical louvers. The overall louver height is determined per the architectural schedule.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership