The concrete slab features an overpour that is chipped back at the lobby to protect the edge. Tile is installed over a mortar bed set within a concrete recess as detailed per edge-of-slab plans. The transition is centered on the door frame if a door occurs at the opening.
CONCRETE SLAB, OVERPOUR AND CHIP BACK AT LOBBY TO PROTECT EDGE TILE AS OCCURS, SEE FINISH PLAN TRANSITION CENTERED ON DOOR IF DOOR OCCURS MORTAR BED IN CONCRETE RECESS, SEE EOS PLANS PER EOS PLAN
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership