Metal coping cap is installed over the top of a concrete tilt-up wall panel and secured with a continuous cleat fastened at sixteen inches on center. The coping slopes inward toward the roof and features a PVC roof membrane running over rigid insulation and a steel deck. Sealant is applied with fasteners spaced at twenty-four inches on center on both sides.
SEAL PVC ROOF FASTENED @ 24" O.C. BOTH SIDES RIGID INSULATION A A SLOPED INWARD CONTINUOUS CLEAT FASTENED @ 16" O.C. SECTION AA STEEL DECK (SEE STRUCT.) CONCRETE TILT- UP PANEL 3" = 1'-0" A511 B2 COPING DETAIL
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership