Horizontal wood planks are fastened through the tongue to a one-half-inch plywood substrate over gypsum board. Blocking is provided as required behind the ceiling transition and light fixture integration. A millwork post termination occurs at the feature wall along with an integral base at the finished floor.
SCHEDULED FINISHED FLOOR PARTITION AND WALL FINISH PER SCHEDULE WD-1 HORIZONTAL WOOD PLANKS; SEE ELEVATIONS FOR EXTENTS, FASTEN TO SUBSTRATE THROUGH TONGUE. FINISH NAIL AND PUTTY AS NECESSARY BLOCKING AS REQUIRED 1/2" PLYWOOD SUBSTRATE OVER GYP. BD. - REF WALL TYPES LIGHT FIXTURE WHERE OCCURS - REFERENCE LIGHTING PLAN CEILING SEE RCP 6 1/2" TD-23 MILLWORK 1/4" POST TERMINATION AT FEATURE WALL; RF-4 INTEGRAL BASE AT SKI SCHOOL / 12 AA9.62
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership