This concrete slab joint detail features a PD3 dowel basket measuring 2 inches by 3/8 inches by 12 inches spaced at 24 inches on center or equivalent, positioned above a double slip sheet. A vertical control joint is formed by a one-eighth-inch wide saw cut extending to a depth of D/3 from the top of the slab elevation.
T/SLAB ELEV. (0'-0") 1/8" WIDE x D/3 SAW CUT PD3 DOWEL BASKET (2" x 3/8" x 12") @ 24" O.C. (OR EQUIVALENT) D DOWEL BASKETS AT SPEED BAYS 12 DOUBLE SLIP SHEET 2"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership