Cold-formed steel framing connects to an existing overhead and bottom concrete deck using twenty-five gauge steel tracks secured with zinc-plated fasteners at twelve inches on center with one-inch embedment. Three and five-eighths inch metal studs spaced at sixteen inches on center span between the top and bottom tracks. One layer of five-eighths inch gypsum board finishes the partition assembly.
3 5/8" METAL STUDS, 25 GA SPACE 16" O.C., FASTEN TO UNDERSIDE OF CONCRETE DECK W/ ZING PLATED FASTENERS AT 12" O.C., 1" EMBEDMENT. 1 LAYER 5/8 GYP. BOARD EXISTING CONCRETE DECK EXISTING CONCRETE DECK (TOP & BOTTOM) 25 GUAGE STEEL TRACK, ZINC PLATED FASTENERS AT 12" O.C., 1" EMBEDMENT (TOP & BOTTOM) METAL STUDS PER WALL TYPE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership