Floor transition between polished concrete and epoxy flooring occurring beneath the centerline of a closed door. The concrete slab supports both flooring finishes per schedule. A dashed line indicates the position of the closed door directly above the floor level transition.
DASHED LINE INDICATES POSITION OF CLOSED DOOR WHERE OCCURS CONCRETE FINISHED AS SCHEDULED EPOXY FLOORING PER SCHEDULE FLOOR LEVEL CL DOOR (CLOSED) AND TRANSITION
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership