Scheduled wall tile is installed over a tile backer board and vapor membrane applied to cold-formed metal studs at the partition corner. The assembly provides a tiled finish surface for wet or high-traffic interior spaces.
PARTITION PARTITION SCHEDULED SCHEDULED WALL TILE TILE BACKER AND VAPOR MEMBRANE OVER METAL STUDS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership