A concrete dock leveler pit recess features a metal mounting angle at the perimeter and requires coordination of all dimensions with the dock leveler manufacturer. Concrete placement follows the manufacturer instructions relative to the finish floor elevation.
COORDINATE ALL PIT DIMENSIONS W/ DOCK LEVELER MANUF. W/ DOCK LEVELER MANUF. COORDINATE ALL PIT DIMENSIONS METAL MOUNTING ANGLE DOCK LEVELER PIT RECESS. CONCRETE PER MANUF. INSTRUCTIONS FINISH FLOOR ELEVATION
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership