The scheduled luxury vinyl tile plank floor meets at a net fit joint created using an underscribe tool, positioned directly beneath the centerline of the door leaf. The subfloor build-up is varied as necessary to achieve a completely flush transition across the threshold. The finish floor assembly matches the requirements referenced on sheet A0.3.
SCHEDULED LVT PLANK FLOOR DOOR; REF. DOOR SCHEDULE FLOOR TRANSITION OCCURS @ CENTERLINE OF DOOR LEAF, TYP. C L NET FIT BETWEEN TILES USING AN UNDERSCRIBE TOOL SCHEDULED LVT PLANK FLOOR FINISH FLOOR BUILD UP ASSEMBLY - SEE A0.3. VARY SUB BUILD UP AS NECESSARY TO ACHIEVE FLUSH TRANSITION ALIGN