Pre-formed corners are installed at the door frame per step four a, followed by the application of sealant five at the junction per step four b. The assembly accommodates the depth of the door frame above the protected membrane level.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership