An existing mechanical shaft designated as shaft S-2 requires an infill to match the elevation and finish of the adjacent existing floor slab. Structural drawings must be consulted for the structural infill requirements. The detail provides guidance for closing out unused vertical penetrations within an existing floor plate.
SHAFT S-2 2 INFILL EXISTING MECHANICAL SHAFT TO MATCH ADJACENT EXISTING FLOOR SLAB ELEVATION AND FINISH, SEE STRUCTURAL
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership