A scheduled LVT plank floor meets a scheduled resilient floor beneath a door leaf centerline. A TD-17 wheeled traffic transition strip bridges the gap between the varying finish heights. The underlying floor build-up assembly varies as necessary to achieve a flush transition between the two finish materials.
DOOR; REF. DOOR SCHEDULE FLOOR TRANSITION OCCURS @ CENTERLINE OF DOOR LEAF, TYP. C L TD-17 WHEELED TRAFFIC TRANSITION 1/4" TO 1/8" FINISH SCHEDULED RESILIENT FLOOR SCHEDULED LVT PLANK FLOOR FINISH FLOOR BUILD UP ASSEMBLY - SEE A0.3. VARY SUB BUILD UP AS NECESSARY TO ACHIEVE FLUSH TRANSITION
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership