An exterior soffit termination at the fourth floor slab edge integrating concrete over metal deck, cold-formed metal stud framing, and a direct-applied finish system over metal ceiling joists. The assembly interfaces with an aluminum curtain wall system below the soffit line at elevation 39'-0".
H-2 FOURTH FLOOR 39'-0" AH12.4c 1 CONCRETE OVER METAL DECK METAL STUD FRAMING DIRECT-APPLIED FINISH SYSTEM OVER METAL CEILING JOISTS ALUMINUM CURTAIN WALL SYSTEM AH12.5 16
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership