Vertical junction between a window assembly and a structural steel framing member with a metal deck and concrete topping. The deck bearing is established at elevation 120'-6", while the upper mechanical level is located at elevation 122'-0 1/2". Insulation and exterior wall construction interface directly with the floor and ceiling transition zones.
DECK BEARING 120'-6" MECH. UPPER 122'-0 1/2"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership