A three-quarter-inch MT25 steel plate connects to the metal framing of a scheduled partition with countersunk screws aligned to the portal header above. The rear of the steel plate aligns with the portal header, positioned four inches and one and a half inches from specified reference points. Scheduled tile is set over a thinset mortar bed across the metal framing assembly.
METAL FRAMING 3/4" MT25 STEEL PLATE SCHEDULED TILE THINSET MORTAR BED COUNTERSUNK SCREW, COORDINATE ALIGNMENT WITH COUNTERSUNK SCREWS IN HEADER ABOVE. SCHEDULED PARTITION, REFER TO PLANS 1 1/2" 4" REAR OF PLATE TO ALIGN WITH PORTAL HEADER METAL FRAMING 3/4" MT25 STEEL PLATE SCHEDULED TILE THINSET MORTAR BED COUNTERSUNK SCREW, COORDINATE ALIGNMENT WITH COUNTERSUNK SCREWS IN HEADER ABOVE. SCHEDULED PARTITION, REFER TO PLANS 1 1/2" 4" REAR OF PLATE TO ALIGN WITH PORTAL HEADER
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership