A hollow metal frame connects to a scheduled metal stud partition framed with two twenty-gauge metal studs at the jamb. Sealant is applied at the interface between the metal frame and the wall finish. A scheduled tile finish is detailed returning to the frame profile.
SEALANT HOLLOW METAL FRAME SCHEDULED METAL STUD PARTITION (2) METAL STUDS @ JAMB - 20 GAUGE MINIMUM FRAME DEPTH SCHEDULED TILE FINISH
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership