An exterior elevator shaft head assembly features prefinished aluminum perforated metal panels supported by an aluminum horizontal and vertical framing system. The panels and framing tie back to hollow structural section outriggers welded to hollow structural section beams. Adjacent wall construction consists of seven-eighths-inch cement plaster over metal lath and a weather-resistant barrier.
17 TIER 7 64' - 0" 7/8" CEMENT PLASTER OVER METAL LATH OVER WEATHER RESISTANT BARRIER ALUMINIUM HORIZONTAL FRAMING SYSTEM ATTACHED TO VERITCAL FRAMING SYSTEM BY MFR PRE FINISHED ALUMINUM PERFORATED METAL PANEL EXTERIOR ELEVATOR SHAFT 10" 1'-9" TIER 3 22' - 0" ALUMINIUM HORIZONTAL FRAMING SYSTEM ATTACHED TO VERITCAL FRAMING SYSTEM BY MFR PRE FINISHED ALUMINUM PERFORATED METAL PANEL 6X HSS OUTRIG WELDED TO HSS BEAM. VERTICAL AND HORIZONTAL PANEL FRAMING SUPPORT AND ATTACHMENT TO CHAMFERED ON EDFE 3" LINE OF VERTICAL FRAMING SYSTEM BY MFR. 10"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership