Precast concrete panels align above a continuous footing with a vertical joint between panels. Number 5 dowels span from the precast concrete panel into the slab. Centerline markers designate the alignment of the panel and footing.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership