A vertical pipe drops from the ceiling framing and transitions through an elbow into an angled pipe run. The angled run terminates with a flanged tee valve assembly connected via bolted flanges.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership