The assembly consists of a central hollow structural section (HSS) wall support flanked by metal studs to infill between tube steel posts. Both sides are finished with 5/8-inch gypsum board layers. A continuous track and 3/4-inch plywood blocking cap the top of the core assembly.
* 2-HOUR ASSEMBLY PROVIDED FOR SOUND 1-HOUR REQUIRED P6B METAL STUDS TO INFILL BETWEEN TUBE STEEL POSTS. RE: STRUCTURAL 5/8" GYPSUM BOARD SEE SCHEDULE SEE INTERIOR ELEVATIONS FOR HEIGHT SHORT WALL CL EQ EQ CORE VARIES HSS WALL SUPPORT SEE: FLOOR PLANS & STRUCTURAL CONTINUOUS TRACK 3/4" PLYWOOD BLOCKING A-551 B3
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe